[ad_1]
Lyon Architects Office Following a competitive tender process, the City of Monash selected to design the Glen Waverley Municipal Precinct.
The vision for the Glen Waverley Civic District scheme is to create a vibrant, modern community center at 281 Springvale Road, adjacent to the Harry Seidler designed Waverley Civic Centre. The proposals include the redevelopment of the existing library as well as the introduction of new community facilities.
Mayor Nicky Luo said the city was pleased to have Lyons Architects involved in the project. “Lyons Architects is a well-known architecture firm with a strong track record of delivering award-winning public spaces across Australia,” she said. “With a focus on creating high-quality public spaces, sustainability and community engagement, Lyon Architects will work with the council and our community to bring this exciting project to life.”
Lyons Architects will build on the work delivered by ARM Architecture to prepare a schematic design for community consultation in 2023. These preliminary designs proposed extending the existing library building to three floors – two to accommodate the library and a third to house the library. Office Space. Flexible multi-use community spaces are proposed on the ground floor for events and meetings.
Initial plans also included a direct connection to the council’s civic centre. Landscaped gardens are proposed for the exterior areas surrounding the Civic Center, as well as an open and active plaza for the community to gather.
According to the Monash City Council website, the proposed library will be four times the size of the current library and will include quiet areas, children’s areas with activity spaces, parent rooms and teen areas.
“The Council is grateful to the ARM architecture team for their work on this project, which allowed us to present a compelling and exciting concept to our community last year,” Luo said. “The ARM team has positioned this project for success and we look forward to realizing this vision.”
The detailed design phase will begin with a review of community feedback received and compiled in 2023.
[ad_2]
Source link